Jack and Connie went around to the back of the station and none of her keys opened the little storage room that was attached to the station so Jack said I'll get a locksmith to open it and replace all of the locks but there is so much to do that I want to get accomplish before the city comes back out. Both of them worked till almost ten that night. Jack had the entire outside of the station sandblasted and would start painting the next day.

The next day Jack used a spray gun and had most of the outside painted the color that Connie's father had him paint it. It really looked good After finishing the outside he started to paint the inside. After a second extremely late working day the inside was also painted. As Jack painted the office Connie was cleaning the two bays then Jack sprayed painted the garage bays. It really looked nice

The next day the lift company came out and test them and said they just needed some hydraulic fluid added so that company did that and the lifts quit their squealing. The next day the EPA came out and check both gas tanks and said they were in great shape and could be filled with gasoline.Jack called the local oil manufactory company and got ahold of someone who could come out and sale him the pumps that he wanted.




Most Popular